GSECL seeks consultant for pumped storage project

Share

Gujarat State Electricity Corp. Ltd (GSECL) has issued a tender to select a consultant for a standalone pumped storage hydropower project at UKAI Dam Reservoir in Gujarat. The proposed Ukai pumped storage schemes are planned on the periphery of the existing Ukai reservoir which will function as the lower reservoir of the scheme. 

The brief scope of work includes providing consultancy services for the preparation of feasibility report, detailed project report (DPR), approval of DPR from statutory agencies, and obtaining requisite statutory clearances for implementation of the pumped storage schemes in the proposed locations.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

“Multi-dimensional renewable energy growth key to India’s long-term development and energy security”
09 March 2026 India’s renewable energy expansion will extend beyond utility-scale projects to distributed renewable energy, green open access and emerging prosumer...