GSECL seeks consultant for pumped storage project

Share

Gujarat State Electricity Corp. Ltd (GSECL) has issued a tender to select a consultant for a standalone pumped storage hydropower project at UKAI Dam Reservoir in Gujarat. The proposed Ukai pumped storage schemes are planned on the periphery of the existing Ukai reservoir which will function as the lower reservoir of the scheme. 

The brief scope of work includes providing consultancy services for the preparation of feasibility report, detailed project report (DPR), approval of DPR from statutory agencies, and obtaining requisite statutory clearances for implementation of the pumped storage schemes in the proposed locations.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

India’s blueprint for sustainable solar success
13 February 2026 By embedding quality benchmarks into procurement and manufacturing incentives, policymakers are ensuring that India’s energy transition is durable, no...