Skip to content

offgrid solar

Volta Energy unveils new solar generator for construction sites, pumps

Netherlands-based Volta Energy has launched a 15 kVA portable solar generator to provide offgrid power equipment for use on construction sites. The system includes solar panels, an inverter, battery, trailer, and a backup bio-diesel generator.

1

Hybrid hydrogen-battery system for off-grid PV-powered homes

Conceived by a Dutch research group, the proposed system is intended to store surplus renewable electricity via hydrogen generation and battery storage, with the latter being used only when hydrogen generation is not immediately available. Despite its high initial costs, the system can reportedly offer stable operation.

Growatt nearing 1 GW of solar inverter shipments in India this year

The Chinese inverter maker has expanded its offerings in India beyond commercial and residential solar sector by launching 250 and 253 kW inverters for the utility segment. It also plans to bring its offgrid solutions to the Indian market in 2022.

Punjab tenders off-grid solar

Installers have until September 23 to submit their bids to set up different capacities of off-grid solar plants in Bathinda city. Techno-commercial bids will open on September 24.

Foldable solar panel for disaster prevention

The portable module has a foldable design with a four-panel structure and a power output of 100 W. It also incorporates a Suncast module that indicates the best height and tilt angle it must have to ensure optimal yield.

1

India will auction 80 GW of solar, wind capacity by March 2020

The Indian Government plans to tender 60 GW of solar and 20 GW of wind capacity by March 2020. This would complete the planned auctions for its targets of 100 GW solar and 60 GW wind installations by 2022, leaving two years for project execution, according to an year-end review by the Ministry of New and Renewable Energy (MNRE).

Extent of India’s new utility-scale solar has almost halved in six months

India added 1.2 GW of large-scale projects in the third quarter of 2018-19, taking new capacity in the first half to 1.9 GW. The numbers are down 43% and 44%, respectively, on the same periods of the previous year, according to Bridge to India’s quarterly India Solar Compass.

This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close