From ESS News
Chinese battery storage manufacturer ZOE Energy Storage has signed a joint venture with an unnamed Saudi partner to establish a BESS manufacturing facility in the Kingdom, its second overseas production hub after Hungary.
The 150-acre facility will be built in two phases. Phase I targets 6 GWh of annual production capacity, with manufacturing set to begin in Q1 2027. Phase II expands that to 18 GWh, though no timeline for the second phase has been confirmed.
ZOE says the facility will carry “Made in Saudi” certification and comply with local grid codes, targeting supply to Saudi Arabia, the broader Gulf region, the Middle East, North Africa, Central Asia, and Africa. A Green Energy Academy is planned on site for technical training.
The Saudi partner has not been named in the announcement. ZOE has also not disclosed the facility’s capital cost or the ownership structure of the joint venture.
Previously in Saudi energy storage deals, Chinese battery manufacturer Cornex named Al Rajhi Electrical for a different 5.5 GWh localization and supply deal. Al Rajhi Electrical is a wholly owned subsidiary of the Saudi diversified conglomerate Al Rajhi Group and a major shareholder of ACWA POWER
Saudi Arabia has set targets of 130 GW of renewables, 48 GWh of energy storage, and 50% clean power generation as part of Vision 2030, creating demand for domestic manufacturing capacity that the country currently meets through imports.
“The Middle East is a key engine of global energy transformation. This manufacturing base is a decisive step in our global strategy,” said Huang Jun, chairman of ZOE Energy Group.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.






By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.