Neuron Energy unveils 1.5 GWh lithium battery factory

Share

EV battery manufacturer Neuron Energy has unveiled its lithium-ion battery manufacturing facility with an annual output of 1.5 GWh. The facility in Chakan, Pune, spans 5 acres and will produce high-performance lithium-ion batteries for a diverse range of applications, including two-wheelers, three-wheelers (L3 and L5 categories), golf carts, drones, battery energy storage systems (BESS), and telecom solutions.

The facility is built with an INR 25 crore investment and houses a 6,500 sq. ft. experience centre to showcase Neuron’s advanced technologies and a 5,000 sq. ft. research and development centre focused on continuous innovation in energy storage.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Indian startup launches plug-and-play hydrogen cooking unit
06 April 2026 Indian clean-tech startup Greenvize has launched a compact hydrogen-based cooking system designed for residential and commercial kitchens. The system...