Siegwerk inaugurates solar plant for consumption by its Bhiwadi printing ink facility

Share

Siegwerk, a global provider of printing inks and coatings, has inaugurated its solar power plant in Jaisalmer, Rajasthan, on the occasion of World Environment Day 2024. This project will  propel the company closer to its goal of achieving 30% renewable energy consumption at its Bhiwadi Centre of Excellence (CoE) by the year 2025. 

The plant, installed recently, is expected to generate 2,028,000 kWh of electricity per year, significantly contributing to Siegwerk’s renewable energy targets.

The solar park spans 2.7 acres in Jaisalmer. The high level of sun radiation in the area ensures efficient and abundant electricity generation, supporting Siegwerk’s energy needs at the Bhiwadi site. The solar park will contribute to environmental sustainability by reducing carbon emissions by 1,843 tons annually. 

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

India’s energy storage market poised for breakout year: IESA
06 January 2026 While 2025 was marked by an unprecedented 102 GWh of energy storage tenders, 2026 will see projects awarded since mid-2023 finally materialize into co...