Skip to content

Gujarat

Adani Green Energy surpasses 12 GW renewable energy capacity

Adani Green Energy Ltd (AGEL) has surpassed a record 12 GW of operational portfolio with the recent commissioning of an additional 275 MW solar capacity at its 30 GW renewable energy plant under development at Khavda, Gujarat.

Jakson Engineers supplies 100 MW of solar modules to GIPCL

Jakson Engineers delivered 190,000 high-efficiency bifacial panels for Gujarat Industries Power Co. Ltd’s 2,375 MW Solar Park. The modules were manufactured by Jakson Solar Modules and Cells.

Gujarat seeks consultant for 14.2 GW of pumped storage projects, tenders 110 MW floating solar EPC

Gujarat State Electricity Corp. Ltd (GSECL) is looking to assess the feasibility of 14,210 MW of pumped storage projects across 16 locations in Gujarat. It has also tendered EPC of 110 MW floating solar in the state.

Army Solar building 3 GW TOPCon module factory in Surat

Army Solar, PV manufacturing arm of Army Looms and Textile Co., plans to start production from its 3 GW TOPCon solar PV module manufacturing facility by the end of April.

1

Waaree Renewable Technologies secures EPC for 40 MWh battery storage

Waaree Renewable Technologies has received a Letter of Award (LoA) from Continuum Green Energy for engineering, procurement and construction of 40 MWh battery storage in Gujarat. The energy storage will be integrated in Continuum Green Energy’s wind-solar hybrid renewable projects for industrial consumers.

Waaree breaks ground on alkaline electrolyser factory

Waaree Group has started building its alkaline electrolyser manufacturing facility in Gujarat. The facility will initially commence operations with a production capacity of 300 MW.

2

Gensol Engineering wins 245 MW solar project at Khavda RE Power Park

Gensol Engineering has won the contract for engineering, procurement, construction and three years of operation and maintenance services of a 245 MW solar PV project at Khavda RE Power Park in Gujarat.

HG Infra Engineering sets up battery storage arm

H.G. Infra Engineering has incorporated a wholly owned subsidiary company, H.G. Gujarat Bess, to carry our business in the field of battery energy storage systems.

How Gujarat is balancing industrial and environmental goals

Gujarat’s commitment to balancing industrial growth with environmental sustainability is a model for other states to follow. By harnessing solar energy, advancing green hydrogen production, and promoting energy storage technologies, the state is building a robust framework for a sustainable future.

1

Gujarat tenders 500 MW/1 GWh battery storage, 500 MW solar projects

Gujarat Urja Vikas Nigam Ltd (GUVNL) is accepting bids to set up 500 MW/1 GWh of standalone battery energy storage systems, connected to the state grid, on a build-own-operate basis in Gujarat. It has launched a separate tender to set up 250 MW of grid-connected solar power projects with Greenshoe option of additional capacity up to 250 MW. These PV projects can be located anywhere in India.

1

This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close