H.G. Infra Engineering secures Letter of Intent for 300 MW/600 MWh battery storage project in Gujarat

Share

H.G. Infra Engineering Ltd announced this week that it has received a Letter of Intent (LOI) from Gujarat Urja Vikas Nigam Ltd (GUVNL) for the development of a 300 MW/600 MWh standalone battery energy storage system (BESS) in Gujarat. The project was awarded under GUVNL’s Phase VI auction for 500 MW/1,000 MWh of BESS capacity through a tariff-based competitive bidding process.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

India’s blueprint for sustainable solar success
13 February 2026 By embedding quality benchmarks into procurement and manufacturing incentives, policymakers are ensuring that India’s energy transition is durable, no...