NTPC REL tenders BoS of 1 GW solar in Rajasthan

Share

NTPC Renewable Energy Ltd (NTPC REL) has invited bids for the balance of system (BoS) package to develop 1 GW (2x300MW+2x200MW) of grid-connected solar PV projects at Bikaner, Rajasthan.

The scope of work includes design, engineering, manufacturing, supply (excluding PV modules), installation, testing and commissioning, and comprehensive operation and maintenance of the solar PV plant along with electrical equipment, consumables, and spare parts for a period of three years from commissioning of the full project capacity.

Bidding closes on May 15.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Cummins launches all-in-one containerized BESS solutions in India
11 September 2025 Cummins has introduced fully integrated, plug-and-play battery energy storage system (BESS) solutions in India, with capacities ranging from 211 kWh t...