NTPC REL tenders BoS of 1 GW solar in Rajasthan

Share

NTPC Renewable Energy Ltd (NTPC REL) has invited bids for the balance of system (BoS) package to develop 1 GW (2x300MW+2x200MW) of grid-connected solar PV projects at Bikaner, Rajasthan.

The scope of work includes design, engineering, manufacturing, supply (excluding PV modules), installation, testing and commissioning, and comprehensive operation and maintenance of the solar PV plant along with electrical equipment, consumables, and spare parts for a period of three years from commissioning of the full project capacity.

Bidding closes on May 15.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Pace Digitek secures 250 MW/500 MWh BESS contract from NLC India Renewables
18 May 2026 Pace Digitek has secured a contract worth INR 7,099.19 million (including GST) from NLC India Renewables for the deployment of a 250 MW/500 MWh batter...