SJVN launches 1.5 GW/6 GWh renewables-plus-storage tender

Share

SJVN is seeking bids from developers to set up 1.5 GW of renewable energy projects backed with energy storage systems for assured peak supply of 6 GWh (1.5 GW x 4 hours).

The projects are to be developed on a build-own-operate (BOO) basis. They can be located anywhere in India and must connect to the interstate transmission system (ISTS).

The selection of developers will be done via tariff-based competitive bidding.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Indosolar shares to resume trading from Thursday
18 June 2025 Solar manufacturer Indosolar Ltd’s equity shares will resume trading on the stock exchanges from Thursday, June 19, 2025. The shares will be listed un...