SJVN launches 1.5 GW/6 GWh renewables-plus-storage tender

Share

SJVN is seeking bids from developers to set up 1.5 GW of renewable energy projects backed with energy storage systems for assured peak supply of 6 GWh (1.5 GW x 4 hours).

The projects are to be developed on a build-own-operate (BOO) basis. They can be located anywhere in India and must connect to the interstate transmission system (ISTS).

The selection of developers will be done via tariff-based competitive bidding.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Solarix Solar launches new terracotta solar panel
09 July 2025 The Netherlands-based solar façade panel and mounting system provider has added a new terracotta rooftop module to its product range. It also announce...