NTPC launches 1 GW wind-solar hybrid tender

Share

NTPC Ltd has invited bids from hybrid power generators to supply 1 GW power from interstate transmission system (ISTS) connected wind-solar hybrid power projects anywhere in India. The projects are to be developed on a build-own-operate (BOO) basis.

Bidding closes on April 16.

In a separate tender, NTPC Green Energy Ltd has invited bids for comprehensive operation and maintenance of 225 MW Bilhaur solar power project in Uttar Pradesh. Contract period is 36 months for Bilhaur-1 (140 MW) and 33.5 months for Bilhaur-2 (85 MW) from the date of Letter of Award (LOA).

Bidding closes on March 27.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Sodium-ion batteries present an opportunity for India to establish an indigenous energy storage ecosystem
14 January 2025 Sodium-ion batteries, with the abundance of input materials, make a viable choice for India to reduce its reliance on imports to meet its energy stora...