NTPC tenders 3 GW of renewables storage

Share

NTPC Ltd has launched a tender to select developers for 3 GW of firm, dispatchable power from renewable energy projects anywhere In India. The projects are to be developed on a build-own-operate basis.

Bids should reach NTPC latest on or before Dec. 12.

In a separate tender, NTPC Renewable Energy Ltd (NTPC REL) has invited bids to develop 630 MW (2x 315 MW) of grid-connected solar pv projects on an EPC basis in the Barethi district of Madhya Pradesh. The brief scope of work includes design, engineering, manufacturing, supply, installation, testing, commissioning, and three-year operation and maintenance of the grid-connected solar PV plant. The capacity is tendered under the Open category, so cells and modules of any origin can be used.

Bidding closes on Dec. 29.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Will Indian solar manufacturers go back-contact to the future?
08 October 2024 Indian PV manufacturers are looking beyond tunnel oxide passivated contact (TOPCon) solar. Back-contact (BC) devices are an enticing prospect but many...