NTPC launches 1.5 GW wind-solar hybrid tender

Share

NTPC Ltd has invited bids to develop 1.5 GW of wind-solar hybrid power projects. The projects can be located anywhere in India, as long as they are connected to the interstate transmission grid.

The projects will be awarded through international competitive bidding followed by reverse auction.

Bidding will close on August 22 and technical bids will open the same day.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Waaree Energies profit rises 101.45% YoY in FY 2026
29 April 2026 Waaree Energies has reported revenue from operations of INR 26,536.77 crore for FY 2026, an increase of 83.72% year-on-year. Profit after tax for the...