Avaada Energy wins 560 MW (DC) solar project in Maharashtra

Share

Avaada Group announced today its arm Avaada Energy has secured a 560 MW (DC) solar project in Maharashtra. 

The project was awarded by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) through competitive bidding followed by an e-Reverse auction. Out of the overall 700 MW (DC) auctioned, Avaada emerged as the winner for 560 MW with a quoted tariff of INR 2.88 ($0.035)/kWh.

As per bid terms, MSEDCL will sign a 25-year power purchase agreement with Avaada. The project is set for commissioning within 18 months. It is expected to generate about 951 million units annually and help reduce 8,85,563 tons of CO2 equivalent emissions annually. The solar project can potentially power 7 lakh households with green energy.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

KPI Green secures Letters of Intent for 917 MW DC of solar, hybrid RE projects
25 July 2024 KPI Green Energy has secured a cumulative solar capacity of 250 MW AC (275 MW DC) and hybrid RE power projects of 370 MW AC (642 MW DC) in Gujarat Urj...