NCRTC opens bids for rooftop solar in Delhi-Ghaziabad-Meerut rail corridor

Share

The National Capital Region Transport Corporation (NCRTC) has invited bids to install RESCO mode rooftop solar plants in the Regional Rapid Transit System (RRTS) corridor project connecting Delhi, Ghaziabad, and Meerut.

The prospective contractor’s scope of work includes design, engineering, supply, installation, testing, and commissioning of the rooftop solar project and associated support structure works. It will also provide comprehensive operation and maintenance support for 25 years post-commissioning.

The completion period for the project (including commissioning) is 15 months.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Waaree launches all-in-one solar kits at RenewX 2025
23 April 2025 Waaree all-in-one solar kits are available in multiple capacities—from 3 kW to 10 kW for homes, and up to 5 MW for commercial and industrial clients.