NCRTC opens bids for rooftop solar in Delhi-Ghaziabad-Meerut rail corridor

Share

The National Capital Region Transport Corporation (NCRTC) has invited bids to install RESCO mode rooftop solar plants in the Regional Rapid Transit System (RRTS) corridor project connecting Delhi, Ghaziabad, and Meerut.

The prospective contractor’s scope of work includes design, engineering, supply, installation, testing, and commissioning of the rooftop solar project and associated support structure works. It will also provide comprehensive operation and maintenance support for 25 years post-commissioning.

The completion period for the project (including commissioning) is 15 months.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Saatvik Green Energy secures INR 299.40 crore solar module order
06 November 2025 Saatvik Green Energy has secured orders aggregating to INR 299.40 crore for supply of n-type TOPCon solar PV modules. The supply of modules is schedul...