Skip to content

REIL

REIL tenders 50 MW rooftop solar on government buildings

Rajasthan Electronics & Instruments Ltd (REIL) is accepting bids to develop grid-connected rooftop solar plants on government buildings across India. The plants are to be developed under the RESCO model.

REIL tenders for 2.6 MW of mono PERC modules

Domestic manufacturers have until November 19 to bid for supplying the mono-crystalline/mono PERC silicon solar modules rated for a peak power output of 380-390W each.

REIL tenders 8 MW rooftop solar capacity in Rajasthan

Bidders have until May 10 to lodge their interest in installing and commissioning the grid-connected solar capacity at various training and educational institutions across the State.

REIL seeks 150,000 multi-crystalline silicon solar cells

Bids are invited from Indian manufacturers to supply four-/five-busbar multi-crystalline silicon solar cells rated for 4.5W peak output. Bidding closes on March 15.

REIL seeks two lakh multi-crystalline silicon solar cells, again

Manufacturers have until December 22 to bid for supplying 200,000 four-/five-busbar solar cells rated for a power output of 4.5 watts. 

REIL tenders for supply of 5.8W mono PERC solar cells

Bids are invited from Indian manufacturers to supply 5000 mono PERC silicon solar cells. The deadline for bid submission is December 23.

REIL seeks 200,000 multi-crystalline silicon solar cells

Manufacturers have until December 23 to bid for supplying 100,000 quantities of 4.5W (4-/5-busbar) and 4.60W (5-busbar) cells each. 

REIL tenders for supply of 200,000 multi-crystalline silicon solar cells

Manufacturers are invited to supply 100,000 quantities of 4.5W (4-/5-busbar) and 4.60W (5-busbar) cells each. Bidding closes on November 3.

REIL seeks bifacial and mono PERC solar cells

November 10 is the bidding deadline for the supply of 50,000 bifacial cells with a peak power rating of 5W and 100,000 mono PERC cells (50,000 of 7Wp and 10Wp each).

Installers sought for 1,000 EV charging stations nationwide

Contractors will be required to identify sites and develop, operate and maintain interoperable electric chargers in more than 75 cities.