Sunsure Energy has signed a long-term agreement for supplying hybrid renewable power combining solar and wind to Deepak Fertilisers And Petrochemicals Corp. Ltd’s facility located in Raigad, Maharashtra.
The Chinese manufacturer said the product line includes five models with outputs ranging from 25 kW to 50 kW, supporting charge and discharge currents of up to 150 A.
India’s Production-Linked Incentive (PLI) programme for cell manufacturing has attracted investment into gigafactories and electrode production, but local manufacturing can only succeed if it has access to steady, domestic mineral feedstock. Recovered materials from end-of-life batteries can supply a meaningful share of that requirement, provided there is strong collection infrastructure, organised supply aggregation, and investment in processing technologies.
Reliance Power arm, Reliance Nu Energies, has received the letter of award for the largest allocation in SJVN’s tender for 1,500 MW/6,000 MWh firm and dispatchable renewable energy. It secured 750 MW/3,000 MWh, representing 50% of the total tender allocation in the competitive bidding based online auction process.
Waaree Energies has unveiled its TEJOMAY series n-type TOPCon dual-glass back-contact module with 645 Wp power output and 23.88% efficiency.
ACME Solar Holdings (ACME Solar) has been awarded 450 MW capacity for assured peak supply of 1,800 MWh (450 MW × 4 hours) from renewable energy projects connected with the interstate transmission system. It secured the capacity in SJVN’s FDRE-IV tender by placing a winning tariff bid of INR 6.75/kWh for 25 years.
The Solar Energy Industries Association (SEIA) says more than half of all power capacity planned through 2030 is under threat from mounting political interference that could stall US renewable deployment.
Sembcorp will develop around 750 MW of renewable energy capacity, supported by battery energy storage systems, to ensure a firm and dispatchable supply of renewable power to SJVN.
A 2 MW solar park in Wallonia, Belgium, will rely 50 kW of hydrogen-producing solar modules developed by Solhyd, a spin-off from KU Lueven. The installation will be the first demonstration of Solhyd’s technology at a commercially-relevant scale.
Adani Group will deploy a 1,126 MW/3,530 MWh battery energy storage system (BESS) at Khavda, the world’s largest renewable energy plant. This project, entailing deployment of more than 700 BESS containers, will be the largest BESS installation in India and one of the world’s largest single-location BESS deployments.
This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.