Adani Green arm secures 1.25 GW pumped storage offtake agreement with UPPCL

Share

Adani Green Energy’s arm Adani Saur Urja has received a long-term offtake deal with Uttar Pradesh Power Corp. Ltd (UPPCL) for 1,250 MW energy storage capacity from pumped hydro storage projects. The company said Adani Saur Urja has received a letter of award (LOA) for procurement of 1,250 MW energy storage capacity from pumped hydro storage projects. It secured the capacity through the e-reverse auction conducted by UPPCL.

The annual fixed cost payable under the LOA is INR 76,53,226 per MW per annum (excluding taxes) for the entire period of 40 years from commissioning.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

“India’s battery energy storage market is transitioning from aggressive tendering to execution-led scale” — Ratul Puri, Chairman, Hindustan Power
14 May 2026 Ratul Puri, Chairman of Hindustan Power, speaks to pv magazine about the key challenges in scaling renewable energy deployment, the growing role of ba...