SJVN allocates 1.5 GW wind-solar hybrid at $0.041/kWh

Share

SJVN Ltd has allocated 1.5 GW of wind-solar hybrid power capacity at an average price of INR 3.41 ($0.041)/kWh. Avaada secured the biggest slice of 470 MW. Ganeko Solar and JSW Energy won 300 MW each.

AMPIN Energy and Juniper Green Energy secured 150 MW each. Other winners include Datta Power Infra (70 MW) and Inaayu Renewables (60 MW). Inaayu Renewables is a special-purpose vehicle of Evergreen Renewables.

The winning developers will establish wind-solar hybrid power projects on a build-own-operate basis for power supply under a 25-year power purchase agreement with SJVN. The projects can be located throughout India and must connect to the interstate transmission system (ISTS). Power procured by SJVN from these projects will be sold to the different buying entities of India.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

KPI Green secures Letters of Intent for 917 MW DC of solar, hybrid RE projects
25 July 2024 KPI Green Energy has secured a cumulative solar capacity of 250 MW AC (275 MW DC) and hybrid RE power projects of 370 MW AC (642 MW DC) in Gujarat Urj...