Premier Energies secures 140 MW PV modules supply order for solar project in Bangladesh

Share

Premier Energies Photovoltaic, a wholly owned subsidiary of Premier Energies, has secured a 140 MW PV modules supply order from Amara Raja Infra for a solar project in Bangladesh. Amara Raja Infra is executing the project on an EPC basis.

The module supply is expected to be completed by April 2025.

Premier Energies Ltd is India’s first company to have a LEED Gold certification for its manufacturing facility. The company, along with its subsidiaries, has an annual installed capacity of 2 GW solar cells and 3.36 GW solar modules, with 1 GW solar cell capacity and 1 GW module capacity under construction.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

RP Sanjiv Goenka Group to set up 3 GW solar cell manufacturing facility in Uttar Pradesh
18 September 2025 The RP Sanjiv Goenka Group is set to establish a 3 GW solar cell manufacturing facility, along with a 60 MW captive solar and energy storage system, w...