KPI Green awarded 145.2 MW wind-solar hybrid project by Ayana

Share

KPI Green Energy Ltd announced today it has been awarded a Letter of Intent (LOI) for a 145.20 MW wind-solar hybrid power project by Bengaluru-based Ayana Renewable Power Four.

KPI will build the project comprising 145.20 MW wind and 50 MW solar components in the state of Gujarat. The project falls under the company’s ‘captive power producer’ business segment, stated KPI.

The company’s scope of work includes land acquisition, design, manufacturing, supply, construction, erection, testing, and commissioning for the balance of plant, as well as facilitating power evacuation facilities and securing the necessary approvals and permits for the project.

The project is scheduled to be completed in the financial year 2024-25.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

KPI Green secures Letters of Intent for 917 MW DC of solar, hybrid RE projects
25 July 2024 KPI Green Energy has secured a cumulative solar capacity of 250 MW AC (275 MW DC) and hybrid RE power projects of 370 MW AC (642 MW DC) in Gujarat Urj...