Adani Green awarded 150 MW solar project by Torrent Power

Share

Adani Green Energy Limited has announced it has received a letter of award from private power utility Torrent Power to set up a 150 MWac grid-connected solar power project in Gujarat.

The project was awarded to the Adani Renewable Energy Holding Fifteen Limited unit after a competitive-bidding power procurement tender by Torrent.

The solar electricity will be supplied for INR2.22/kWh for 25 years and the project is expected to be commissioned in the final quarter of next year.

Adani said it has 3,520 MWac of operating renewables projects. With the latest addition, its clean energy development pipeline reaches 15,390 MWac, of which 11,870 MWac of projects are under implementation.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

PV industry could account for 40% of global silver demand by 2030
15 September 2025 New research from Europe shows that the global PV industry may require up to 14,000 tonnes of silver per year in 2030, with global supply being only 3...