Skip to content

Amp Energy

Amp Energy India powers L&T Metro Rail Hyderabad with solar

The developer has commissioned a 7.805 MW solar plant for Larsen & Toubro’s metro rail project in Hyderabad. Touted to be one of the largest behind-the-meter solar projects in India, the plant will supply electricity to the metro project’s 24 stations and two depots.

1

India still nowhere near energy sufficiency

The government is trying to harness renewables to increase domestic output but will need a more liberal energy market and to consider the structure of procurement auctions, cloying red tape and the financial travails of state utilities if it is to achieve its goals, says Rakshika Kaul of Amp Energy India.

3

Auctions show Indian renewables still primed for growth

A report by the Institute for Energy Economics and Financial Analysis says there is plenty of investment capital available for Indian renewables despite pandemic disruption.

Solar leaders call for overhaul to navigate Covid-19

Faced with raw material and labor shortages, solar manufacturers have stressed the need to find alternative supply chains and to push automation and internet of things applications on the factory floor to keep production running.

6

NTPC 1.2 GW ISTS solar auction sees aggressive tariff of INR 2.43/kWh

Low solar tariff trends can be attributed to developers’ desperate attempt to take advantage of the current situation wherein only safeguard duty of 14.9% is applicable, according to JMK Research.

1

India sets new record-low solar tariff of Rs2.36/kWh

The winning bid, for 300 MW of generation capacity by Spanish developer Solarpack in a 2 GW auction is 3.3% lower than the previous record of Rs2.44.

10

Government allows solar installation in Covid lockdown, industry to abide by safety protocols

The new guidelines on Covid-19 lockdown permit certain industrial activities, including the construction of renewable energy projects from April 20, 2020, in areas not identified as containment zones of the country. The industry will, however, have to abide by the safety protocols.

Amp Energy installs 8.5 MWp rooftop solar plant for Skoda Auto

Touted to be one of India’s largest rooftop installations, the captive plant uses 25,770 photovoltaic panels covering 63,000 sq.m of available roof space and producing 12.2 million KWh of electricity annually.

This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close