Waaree breaks ground on alkaline electrolyser factory

Share

Waaree Group, India’s largest manufacturer of solar PV modules, has started building its alkaline electrolyser manufacturing facility in Valsad, Gujarat. The facility will initially commence operations with a production capacity of 300 MW.

The factory will cater to industries such as steel, refining, transportation, fertilizers, chemicals, food, and power generation, enabling their transition to decarbonized processes.

“The facility will feature the latest in equipment and manufacturing processes to produce high-efficiency, reliable, and durable electrolysers for large-scale green hydrogen production. Designed for low power consumption and flexible operations, these electrolysers will offer unmatched performance with minimal maintenance,” stated Waaree. “The facility will also include automated assembly lines for electrolyser stacks, ensuring precision and scalability.”

Waaree recently won production-linked incentive (PLI) for 300 MW electrolyser manufacturing capacity and for 90,000 MT per annum of green hydrogen production under SIGHT (Strategic Interventions for Green Hydrogen Transition) scheme of Government of India.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Adani Green Energy commissions 307.4 MW renewable projects at Khavda
31 December 2025 The newly commissioned capacity comprises 100 MW of solar power, 176 MW of hybrid RE capacity, and 31.4 MW of wind power.