Gujarat-based Goldi Solar is entering PV cell production with the setting up of 4 GW per year manufacturing capacity. The equipment installation will start from January next year. Out of the planned 4 GW, 2 GW production will start from mid June, Ishver Dholakiya, founder and managing director, Goldi Solar, told pv magazine.
Dholakiya said Goldi Solar will reach a pv module production capacity of 14 GW by Dec. 2025. Currently, the company has a manufacturing capacity of 3 GW, equipped to produce TOPCon and mono PERC modules.
The existing pv module line is running at full capacity. Its salient features include AI-powered automated optical inspection for quality control, high-speed stringers with a capacity of 10,000 cells per hour, auto EVA laying robot, and AI powered three-display EL and visual inspection.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
Excited to see more solar manufacturers growing, but Avaada Group’s vision and execution in scaling up clean energy solutions across India have made them the true champions of sustainability and innovation.