INA Solar breaks ground on 3 GW panel factory in Rajasthan

Share

Insolation Energy (INA Solar) is setting up a 3 GW PV module factory along with 12,000 mtpa aluminium frame plant with an investment of INR 400 crore in the Jaipur district of Rajasthan. The groundbreaking ceremony of the manufacturing facility was performed recently.

INA Solar has an existing PV module capacity of 1 GW. With the new addition, its total PV module manufacturing capacity will reach 4 GW per year.

The new facility will span 109,000 square meters and will have an annual production capacity of 3 GW of n-type TOPCon solar panels and 12,000 metric tons of aluminum frames. It is expected to start production within the current fiscal.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

“India’s renewable energy market is entering a transformative phase”: ENGIE India’s Shantanu Upasani
17 October 2025 Hybrid and storage integration, rising corporate demand, and increased use of digital tools are defining the next phase of India’s renewable energy ma...