GameChange Solar to supply trackers for NLC’s 780 MWp PV project in Gujarat

Share

GameChange Solar announced this week that it has secured a contract with Bondada Engineering Ltd for NLC’s 780 MWp solar project in Khavda, Gujarat. This contract marks GameChange Solar’s largest order at a single location outside the USA. With this addition, GameChange Solar’s project total exceeds 2.5 GW in Khavada alone.

GameChange Solar will supply its Genius Tracker 1P-2Row, with deliveries starting in the fourth quarter of 2024. Genius Tracker 1P-2Row cuts costs and speeds installation by having one controller manage two rows. It comes standard with preassembled components including the elimination of all washers.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

New cooling gel could raise PV module efficiency by 12%
11 June 2025 Researchers in Saudi Arabia have developed a hydrogel composite that absorbs moisture in solar modules overnight and facilitates evaporative cooling t...