India’s Ministry of New & Renewable Energy has announced a Scheme for setting up of 2.500 GW Inter-State Transmission System (ISTS)-connected wind-solar hybrid projects.
For off-grid solar PV installations, the high cost of batteries is the biggest bottleneck. However, the cost of storage is expected to drop as technology advances and volumes go up.
Solarpack, a Spanish solar plant developer, has won the contract to develop five solar photovoltaic plants with a total power of 133 MWp in the Indian state of Karnataka.
Bloomberg New Energy Finance says EVs will make up only 7% of new car sales in nation by 2030, compared to a predicted 44% for European sales, 41% in China, 34% in the US and 17% in Japan
The country will achieve solar PV capacity of 50 to 75 GW by 2022 – a little over 60% of the 100 GW target. Total rooftop capacity will be less than 10 GW.
To smoothen this transition, the country needs to build fast solar PV-powered charging stations. In 2017, there were only 220-250 operational charging stations in India, compared to 56,000 petrol stations.
Azure Power has been awarded a 130 MW solar PV project by the Maharashtra State Electricity Distribution Company Limited (MSEDCL). It is expected to be commissioned in 2019.
India has unveiled a national wind-solar hybrid policy that provides a framework for promotion of large grid connected wind-solar PV systems for optimal and efficient utilization of transmission infrastructure and land, reducing the variability in renewable power generation and thus achieving better grid stability.
Indian energy company Azure Power recently announced that it has connected a 50 MW PV project in the Indian State of Andhra Pradesh. The company states that the completion of this project brings its portfolio of operational solar assets past the 1 GW mark.
In a long-awaited move, farming irrigation systems in Haryana will be powered by solar energy.
This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.