Skip to content

Asia

Andhra Pradesh pulls back on open access solar

The state has decided to withdraw almost all incentives available to open access solar, including exemption from electricity duty and distribution losses for projects injecting power at 33 kV or below. The policy reversal—clearly to appease state discoms—is likely to impact capacity addition.

1

FAME-II: Inter-ministerial panel set up for electric mobility projects

The committee is constituted for overall monitoring, sanctioning and implementation of the scheme, according to an order of the Department of Heavy Industries.

2 GW solar with VGF support tendered for state-run power generators

As part of the viability gap funding scheme for 12 GW of new solar, SECI has invited bids for setting up of 2 GW of grid-connected solar PV projects. The projects, to be developed on ‘build, own, operate’ basis, can be located anywhere in India for self-use or use by government entities at maximum fixed tariffs of Rs 3.50/kWh. The deadline for bid submission is May 3.

Tata Power-DDL to implement smart grid pilot with European backing

Tata Power Delhi Distribution Limited (Tata Power-DDL) has partnered with European firms Enedis, Schneider Electric, Odit-e and VaasaETT to implement a 1MW smart grid pilot in India, which would be insulated from any blackout in the main grid.

Phase II rooftop solar will give a big push to reach 40 GW target: Tata Power CEO

The latest government initiative that offers central financial assistance for Group Housing Societies and Residential Welfare Associations would help better adoption of rooftop solar among residential power consumers, which account for only around 9% of the total rooftop solar systems installed in the country (against almost 70% by industrial and commercial users).

Smart grid management in Rajasthan will be India’s first

GE Renewable Energy will implement, in the state of Rajasthan, an advanced grid management project that will provide real-time data monitoring to better understand current and future energy usage and enable transmission of renewable energy based on demand.

4

No construction permits without solar in one town in Telangana

The municipal council of Karimnagar has mandated rooftop solar on new buildings of a certain size as part of the Ministry of New & Renewable Energy’s Smart City Mission, which requires 10% of municipal energy to be generated from solar.

Avanze setting up 1 GW Lithium-ion cells plant in Andhra Pradesh

Delhi based Avanze Inventive will set up the Lithium-ion cells manufacturing unit in the state of Andhra Pradesh with the help of the Andhra Pradesh Economic Development Board (APEDB). The plant, with total size of 1 GW, will entail a total investment of Rs 1800 crore (US$ 256 million).

Manufacturing the Manufacturing Policy for Indian Solar Modules

India needs a manufacturing policy that is scalable, secure, strategical and supportive and promotes both the growth and spread of solar while protecting the interests of domestic manufacturers.

1

Phase II of Rooftop Solar Scheme approved

The President of India has sanctioned financial outlay of Rs 11,814 crore for phase II of grid-connected rooftop solar programme to achieve ‘40 GW by 2022’ target.

4

This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close