Gayatri Dadheech, chief technology officer at Exide Industries Ltd, told pv magazine their first-phase 6 GWh lithium-ion cell manufacturing capacity in India would become operational by December next year and will produce lithium ferro phosphate (LFP) and nickel-manganese-cobalt (NMC) cells. The following 6 GWh, targeted by 2027, could be based on advanced lithium-ion, solid-state, or other battery technology.
Adani Green Energy has reported a profit after tax of INR 973 crore in FY 2022-23, almost 100% up from INR 489 crore in FY 2021-22.
Kunwer Sachdev, the founder of Su-kam brand inverters in India, has converted his farmhouse in Gurugram into an R&D and manufacturing facility for new-age solar and lithium battery storage products under his new venture Su-vastika Systems. He speaks to pv magazine about their offerings including mobile energy storage, lithium battery tester, solar inverters, and more.
India’s largest natural gas company plans to partner with an undisclosed company to undertake vertically integrated solar manufacturing.
Gaurav Gaba has joined Longi Hydrogen as sales director. Shashank Adlakha is starting a new position as a chief operating officer at Hygenco -The Hydrogen Company.
US investor KKR’s latest investment builds on its $400 million commitment to Serentica Renewables last year.
Indian manufacturer Navitas Solar is ramping up its PV panel capacity to 1.7 GW per year by adding a new 1.2 GW manufacturing facility. The new facility can produce M10 and G12 mono PERC and TOPCon modules.
Solar Energy Corp. of India has published the winners of 1.2 GW of hybrid wind-solar projects, paired with energy storage for assured peak power supply. The lowest tariff awarded was INR 4.64 ($0.057)/kWh.
NTPC Renewable Energy has secured a 500 MW round-the-clock renewable power supply project from REMCL, a joint venture of the Ministry of Railways and RITES Ltd
Oil India intends to deploy battery energy storage systems (BESS) alongside gas engine-driven generators in its field installations. With this arrangement, it will run the generator during the daytime only (while charging the BESS) and draw power from the charged BESS for the night hours.
This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.