Adani Green switches on 408.1 MW renewable energy projects at Khavda

Share

Adani Green Energy Ltd has operationalized an aggregate 408.1 MW RE power projects at Khavda, Gujarat. This includes 87.5 MW solar, 124.8 MW wind, and 195.8 MW hybrid capacity, commissioned through Adani Green Energy Ltd’s various stepdown subsidiaries.

With the commissioning of these plants, AGEL’s total operational renewable generation capacity has increased to 16,486.1 MW.

“Based on the relevant clearances, it was decided at 8.29 a.m. on September 30, 2025 to operationalize these plants and commence power generation from September 30, 2025.” AGEL shared in a stock exchange filing.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

India’s blueprint for sustainable solar success
13 February 2026 By embedding quality benchmarks into procurement and manufacturing incentives, policymakers are ensuring that India’s energy transition is durable, no...