Premier Energies commissions 1.2 GW TOPCon solar cell line at Fab City

Share

Premier Energies has commissioned a new 1.2 GW TOPCon solar cell manufacturing line at Fab City, Hyderabad. The facility delivers cell efficiencies above 25% with advanced 16-busbar architecture allowing higher power density and energy yield under real-world conditions.

The new line boosts Premier’s solar cell capacity from 2 GW to 3.2 GW. The company is currently working on enhancing its cell production capacity to 8.4 GW and module capacity to 11.1 GW (from 5.1 GW at present) by June 2026.

“Commissioning our new TOPCon solar cell line marks a pivotal step in our innovation journey. With high efficiency and AI-enabled architecture, this technology represents the next leap in solar performance,” said Chiranjeev Saluja, managing director & CEO of Premier Energies.

“This commissioning is not just a technological upgrade — it’s a strategic enabler. This achievement aligns seamlessly with our long-term roadmap for vertical integration and global competitiveness,” added Sudhir Reddy, chief strategy officer of Premier Energies. “Notably, 60% of the equipment for this line has been sourced from Europe, reflecting our strategic resilience and commitment to diversifying the key equipment supply chain.”

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Emmvee secures INR 1,500 crore solar module order from KPI Green Energy
24 June 2025 Emmvee has secured an order worth nearly INR 1,500 crore from KPI Green Energy Ltd to supply high-efficiency TOPCon bifacial PV modules for KPI Green’...