Central Electronics Limited (CEL) has invited EPC contractors to set up a cumulative 200 MW of ground-mounted, grid-tied solar power generating systems anywhere in India. The plant sizes will range from 2 MW to 10 MW.

The scope of work includes design, engineering, supply, construction, erection, testing, commissioning, operation, and maintenance of the balance of system for the plants. The responsibility of getting grid connectivity also lies with the EPC contractor.

To be eligible, the applicants must have a minimum average turnover of INR 20 crore in the last three financial years (FY 2018-19, FY 2019-20, and FY 2020-21) from the solar business. It must have designed, supplied, tested, installed, and commissioned a cumulative 5 MW of grid-connected solar plants either directly or indirectly in the last five years. 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

ReNew receives final non-binding offer from Masdar, CPP Investments, ADIA, and Sumant Sinha
04 July 2025 ReNew Energy Global has received a final non-binding offer from a consortium of its promoters to acquire the company’s entire issued and to be issued...