Solex Energy commits INR 4,000 crore to 5 GW solar cell facility, 10 GW BESS factory in Gujarat

Share

Solex Energy has signed a memorandum of understanding (MoU) with the Government of Gujarat to set up a 5 GW solar cell manufacturing facility and a 10 GW battery energy storage system (BESS) factory in the state, with a total planned investment of INR 4,000 crore.

The company plans to develop the 5 GW solar cell facility in two phases, with 2 GW in Phase I and 3 GW in Phase II.

Headquartered in Surat, Gujarat, Solex Energy operates a fully automated, Industry 4.0-enabled manufacturing facility in Tadkeshwar, Gujarat, with a PV module production capacity of 4 GW.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Anker Solix launches 7 kWh modular battery with 5 kW bidirectional inverter
04 May 2026 The system features AI-driven energy management, 10,000-cycle battery life, and scalable expansion up to 126 kWh.