Gautam Solar’s Bhiwani factory close to achieving 3.2 GW capacity in March 

Share

Gautam Solar’s new solar module manufacturing plant in Bhiwani, Haryana, is set to achieve production capacity of 3.2 GWp by March 2025 with two high-speed production lines currently under installation. The facility, spanning over 60 acres, currently has more than 2 GW capacity.  

Gautam Solar plans to achieve a total solar module manufacturing capacity of 5 GW by 2025. 

Gautam Solar operates multiple factories with integrated manufacturing capabilities and is now expanding into solar cell production to address supply chain gaps.

Gautam Solar’s Bhiwani module fab

Gautam Solar

“Gautam Solar has a well-defined strategy to support its ambitious expansion, including significant investments and a planned Initial Public Offering (IPO). This IPO will enhance Gautam Solar’s market presence, strengthen investor confidence, and reduce reliance on external borrowings, ensuring long-term financial stability,” Gautam Solar stated in a media release. 

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Shakti Pumps raises INR 292 crore to set up 2.2 GW solar cell and module factory
07 July 2025 Shakti Pumps (India) Ltd has raised INR 292.60 crore through a qualified institutions placement (QIP). It will utilize the proceeds to establish a gre...