JSW Energy targets 40 GWh/5 GW of storage capacity by 2030

Share

JSW Energy, a private-sector power producer in India, has announced its ambition to become a 20 GW power generating company along with 40 GWh/5 GW of storage capacity by 2030. It is also working towards achieving a solar module manufacturing capacity of 1 GW per year and a green hydrogen production capacity of 3,800 tonnes per annum by 2025.

As of March 31, 2023, JSW Energy installed a cumulative power generation capacity of 6.6 GW across thermal (3.2 GW), wind (1.4 GW), hydro (1.4 GW), and solar (657 MW). Under-construction projects stood at 3.2 GW, which the company expects to commission by the end of 2024. 

JSW Energy plans to scale its renewable energy capacity upwards and foray into energy products and services. In addition to solar and wind generation projects, it is investing in new-age businesses like energy storage, green hydrogen, and solar PV module manufacturing.

The company said its 1 GW of PV wafer-to-module manufacturing capacity will become operational in April 2025. It won this capacity under the government’s Performance Linked Incentive (PLI) scheme. In energy storage, it has a locked-in capacity of 3.4 GWh (2.4 GWh pumped storage and 1 GWh battery storage).

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

PV industry could account for 40% of global silver demand by 2030
15 September 2025 New research from Europe shows that the global PV industry may require up to 14,000 tonnes of silver per year in 2030, with global supply being only 3...