BEL tenders for 2.86 MW of polycrystalline solar modules

Share

Bharat Electronics Limited has invited bids to supply polycrystalline solar modules for 2.86 MWp of grid-connect solar power plants in the Akola and Amravati districts of Maharashtra. 

The modules must be delivered to the site within four weeks from the receipt of the purchase order. These shall be warranted for a period of five years from the date of installation and commissioning or five-years-and-six-months from the date of supply, whichever is earlier.

The conversion efficiency of the module should be a minimum of 16% under standard test conditions. 

District-wise module requirement

BHEL

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Cummins launches all-in-one containerized BESS solutions in India
11 September 2025 Cummins has introduced fully integrated, plug-and-play battery energy storage system (BESS) solutions in India, with capacities ranging from 211 kWh t...