Manufacturers have until January 28 to bid for supplying the modules to solar projects in the Akola and Amravati districts of Maharashtra.
While SmartWire was used for the interconnection of the 60 cell modules from Hevel’s first line, its new modules will utilize ECA cell interconneciton. | Image: Hevel

Bharat Electronics Limited has invited bids to supply polycrystalline solar modules for 2.86 MWp of grid-connect solar power plants in the Akola and Amravati districts of Maharashtra. 

The modules must be delivered to the site within four weeks from the receipt of the purchase order. These shall be warranted for a period of five years from the date of installation and commissioning or five-years-and-six-months from the date of supply, whichever is earlier.

The conversion efficiency of the module should be a minimum of 16% under standard test conditions. 