View article
Vikram Solar commissions 80 MW in Gujarat Vikram Solar has completed 80 MW of PV at two sites in Gujarat under India’s National Solar Mission.
Sraisth
Sep 15, 2017
View article
Moser Baer Solar asks Indian central bank to postpone loan repayment Troubled PV module supplier Moser Baer Solar (MBSL) has asked the Central Bank of India to postpone its loan repayment schedule on claims that its business prospects have been damaged by a deluge of cheap Chinese PV modules that have flooded into the Indian market.
Sraisth
Sep 15, 2017
View article
Manipur get its first 100% solar-powered village Mangaal Rural, a non-governmental organization, has switched on more than 30 off-grid solar PV systems in a village in Manipur, making it the Northeast region’s first 100% solar-powered community.
Sraisth
Sep 15, 2017
View article
Vikram Solar globalizes with module installation in Finland Finnwind Oy, an installer, is Vikram Solar’s strategic partner for PV installation in Finland.
Sraisth
Sep 14, 2017
View article
Indian energy storage market estimated to reach 70 GW by 2022 India Energy Storage Alliance (IESA) estimates the market for energy storage will grow to 100-200 GWh between 2017-22.
Sraisth
Sep 14, 2017
View article
Verizon, IIT install PV+storage systems in rural Telangana The systems, which do not include inverters, pair a 125 W solar panel with a 1 kWh storage battery.
Sraisth
Sep 14, 2017
View article
Interview: India’s storage market readies the ground for growth The executive director of the India Energy Storage Alliance (IESA) Rahul Walawalkar, talks to pv magazine about India’s vast energy storage potential ahead of next week’s World Energy Storage Day.
Sraisth
Sep 14, 2017
View article
India’s National Solar Mission: revisions recommended The standing committee on energy, comprising members of the lower and upper assembly of the parliament, and the secretariat, has released a report recommending vital changes to boost India’s National Solar Mission of 100 GW by 2022.
Sraisth
Sep 12, 2017
View article
PID, soiling and module degradation in hot climates PID in India: In the cost-conscious Indian solar sector, ensuring reliable power output should be the number one priority. However, an example of one solar farm suffering from the ill-effects of under-performing modules, installation malpractice and unsatisfactory maintenance shows how corner cutting from the outset is more damaging in the long run.
Ian Clover
Sep 12, 2017