Solex 2 GW TOPCon cell line to come online by early 2027

Share

Gujarat-based Solex has initiated the work on its state-of-the-art 2 GW n-type TOPCon solar cell manufacturing facility, with operations slated to begin in early 2027.

The new facility will come on land already secured by the company. It’s part of an integrated solar cell-module facility that will also house a 2 GW TOPCon module production line, chairman and managing director Chetan Shah told pv magazine.

This development represents a major leap forward for Solex, which is already operating 1.5 GW of module production capacity and is working on bringing a 2.5 GW module line online by September 2025, boosting its total module output to 4 GW annually.

Looking ahead, the company aims to hit cumulative module capacity of 15 GW and cell capacity of 5 GW by the end of the decade.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

“Next year, the solar tracker market will be much larger”: GameChange Solar CEO
03 November 2025 Vikas Bansal, President and CEO – International, GameChange Solar, expects that 55–60% of India's new utility-scale solar capacity additions in FY 202...