Mecpower Solutions, Navitas Solar partner to establish 5 GWh battery energy storage manufacturing facility in Gujarat
Mecpower Solutions Ltd and Navitas Solar have entered into a strategic collaboration to establish a battery energy storage system (BESS) manufacturing facility with an annual capacity of 5 GWh in Karjan, Gujarat. The facility is expected to commence operations in the first quarter of FY 2027–28.
According to Mecpower Solutions, construction activities at the site have begun, including boundary work, while orders for production-line equipment and machinery have been placed. The facility is targeted for completion by March–April 2027, with the first battery storage container scheduled for delivery in April 2027.
The facility is designed to manufacture approximately 1,000 battery storage containers annually, with initial configurations of 5 MWh and 6 MWh per container. The systems will primarily target utility-scale applications, including standalone storage projects and solar-plus-storage deployments.
The collaboration between Mecpower and Navitas builds on their longstanding business relationship across solar and renewable energy projects. It combines Mecpower Solutions’ strengths in renewable energy project development, engineering, and execution with Navitas Solar’s integrated manufacturing expertise.
By leveraging their respective strengths, Mecpower Solutions and Navitas Solar aim to develop scalable battery storage solutions tailored to utility-scale, commercial, and industrial renewable energy applications.
The facility’s output is expected to support project requirements across both organizations, including EPC deployments and utility-scale renewable energy projects, while also addressing the growing market demand for advanced energy storage solutions.
“As India continues to scale its renewable energy capacity, Battery Energy Storage Systems will be critical in addressing the intermittency of solar and wind power, improving grid flexibility, and enabling more predictable energy delivery,” said Setul Shah, Director, Mecpower Solutions. “Our proposed 5 GWh manufacturing facility in Karjan represents a strategic step towards strengthening our capabilities across the energy storage value chain. By integrating battery storage manufacturing with our EPC and IPP businesses, we aim to develop scalable solutions that address the evolving needs of utility-scale renewable energy projects and support India’s transition towards a more flexible and reliable power ecosystem.”
“As India accelerates its transition towards renewable energy, Battery Energy Storage Systems are emerging as a critical component of the power sector, enabling better management of renewable intermittency, greater grid flexibility, and more efficient energy utilisation,” said Ankit Singhania, Director, Navitas Solar. “Building domestic manufacturing capabilities in this segment will be an important step towards strengthening India’s clean-energy supply chain and supporting the evolving requirements of utility-scale storage projects. Through this collaboration, we aim to extend our manufacturing capabilities into a strategically important segment of the energy transition and contribute to the development of scalable storage solutions for India’s power sector.”
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Please login to comment