GEON commissions 10 MW/20 MWh battery energy storage system in Jaisalmer
GEON, the future technologies division of Kabra Extrusiontechnik Ltd, has successfully executed and commissioned a 10 MW/20 MWh battery energy storage system (BESS) project in Jaisalmer, Rajasthan, on an engineering, procurement, and construction (EPC) basis.
The project was executed in accordance with the Rajasthan Integrated Clean Energy Policy, 2024. GEON’s scope included detailed engineering and design, procurement and supply of equipment, installation, testing, and commissioning.
With a power capacity of 10 MW and an energy storage capacity of 20 MWh, the BESS is designed to support efficient energy management, enhance grid stability and facilitate the effective integration of renewable energy into the power network.
“Having already executed projects of this nature, the commissioning of our 10 MW/20 MWh BESS project in Jaisalmer builds on our experience in delivering utility-scale energy storage solutions,” said Anand Kabra, Chairman and Managing Director, GEON. Each project brings its own technical and operational considerations, and our focus has been on ensuring that the system is equipped to meet the demands of real-world energy infrastructure.”
Founded in 2018, GEON (Green Energy ON) works across e-mobility, energy storage, and electronics, offering lithium-ion battery packs for two-, three-, and four-wheelers as well as off-road vehicles. Its product portfolio also includes BESS, inverter batteries, telecom backup, and commercial and industrial solutions.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Please login to comment