Pace Digitek arm Lineage Power secures 100 MWh BESS order from Kalpa Power
Pace Digitek’s subsidiary Lineage Power has secured an order from Kalpa Power for the supply and commissioning of a 100 MWh battery energy storage system (BESS).
The project is scheduled for execution by Dec. 31, 2026.
During the quarter ended June 30, 2026, Pace Digitek said it successfully delivered 90 BESS containers. As of Aug. 5, 2026, the company’s executable energy order book stood at INR 8,453 crore, while its overall BESS order visibility exceeded 5 GWh, providing strong growth visibility for its energy storage business.
Following the quarter, Pace Digitek operationalized an additional BESS manufacturing platform with an installed capacity of 2.5 GWh, taking its cumulative BESS manufacturing capacity to 5 GWh.
The company also continued to invest in the phased expansion of its BESS manufacturing capacity from 5 GWh to 10 GWh and remains on track to commission its in-house container fabrication facility. The expansion is expected to strengthen localization, operational efficiency, and supply chain integration.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Please login to comment