TOPCon led module manufacturing capacity additions with 39.9 GW, followed by 3 GW of monocrystalline modules. For the first time, 1.2 GW of HJT module capacity was added in the country.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed